I’m helping my son transform his unfinished basement into 1300 square feet of wonderful finished living space. There will even be an old-fashioned speakeasy in it! Copyright 2024 Tim Carter

Basement Finishing Steps and Process - It's Pretty Simple

With home loan interest rates higher than they’ve been in years, you may not be able to move to a larger home. You might be able to obtain the added space you need by transforming unfinished space to delightful finished rooms.

Just a few weeks ago I started to help my son increase the finished living space in his home by nearly 80 percent! Two years ago he purchased a new home that had a full basement. Fortunately the builder installed an outdoor bulkhead with a set of concrete steps. This created the all-important egress door required by almost all codes.

Check Code Minimum Requirements

You should do what my son did before you even think of purchasing any materials. I had him reach out to the city building department. His job was to discover all of the minimum requirements that apply to basement refinishing. Fortunately, the building department had a very clear set of guidelines that must be met to successfully obtain a building permit.

The guidelines and requirements discussed minimum ceiling height, ventilation, insulation and heating, and the all-important egress requirement. Some windows meet the egress requirement. Don’t underestimate the importance of egress. You need to have two ways to exit most spaces in the event of a fire.

Create a Plan

Once you determine you can meet the minimum requirements of your local building code, then it’s time to draw up a plan. My son saved about $8,000.00 by drawing his own plan. He used simple software and with my help created a plan that the building department accepted. In almost all cases, the building department will accept hand-drawn plans that you create using a pencil, ruler, and paper.

The plan doesn’t need to be fancy. Here is my son’s plan. It should inspire you to do your own.

basement remodel plan

You can draw something like this yourself. Copyright 2024 Tim Carter's Son

Do Work in a Specific Order

A remodeling project like this proceeds much like building a home or room addition. It’s very important to do the work in a specific order so you don’t make things harder than they need to be. Be sure to check with your local building department about when all the required inspections must happen. You don’t want to cover up things that must be seen by an inspector.

Here are the steps my son and I will follow. I’ve lost count of the number of basement remodel jobs I’ve done for clients in the past, but each job progressed like this.

In cold climates, I like to add closed-cell foam or open-cell with a protective vapor barrier to the smooth concrete walls. The next step is to install all the framing. Don’t forget that any wood that contacts a concrete floor or wall must be treated lumber. You can purchase treated lumber meant for interior use at most old-fashioned lumber yards.

To save time and money, I anchor the bottom wall plates to concrete using a rotary hammer drill equipped with a 1/4-inch bit. I drill through the wall plate once it’s in place and then into the concrete about 3 inches. I take two 16d sinker nails, place them side-by-side and drive them into the hole. If you’re using framing gun nails, try three of those side-by-side. They do a superb job of anchoring the wall so it won’t move sideways.

After Framing - HVAC, Plumbing, and Electrical

After all the framing is complete, it’s time to install any HVAC ducting or ventilation pipes. These often are more than 4 inches in diameter. You need all the space you can muster to get them to go where you want.

return duct supply

Note how the duct on the left next to the beam gets smaller. The air is moving TOWARD you in the photo as it's the supply trunk line.

Plumbing drains and water lines are next followed by electrical wiring.

cast iron lines meghan house

These are cast iron drains. You might use PVC.

Low-voltage wiring for cable TV, speakers, etc. is last. It’s now time for most inspections. Once you pass these inspections, get out your video camera and record talking videos of all the walls. Describe what you’re looking at. These videos will be so handy years from now if you’re wondering what is behind the drywall!

It’s now time to add any additional insulation and a vapor barrier. Next up is drywall. Be sure to screw it to the walls. Try to use large pieces to minimize flat seams. The drywall should be hung horizontally. Skim-coat the drywall to eliminate joint banding. You can also eliminate it using a special primer/sealer paint.

After you finish the drywall, paint it. You can do small touch-up painting after all the other work is complete. In my son’s basement, the ceilings will be suspended. I try to do this all the time so I have access to anything in the floor joists above.

Once the ceiling is finished, my son and I will install all of the luxury vinyl plank flooring. (LVP) It’s so easy to install it now without any baseboard trim or door jambs in the way.. When the flooring is finished, it’s time to install all the interior doors and any trim. I like to paint all of this wood before it’s installed. This minimizes paint spills on the LVP.

All other finish carpentry happens in the final stage. Be sure to put down tarps as you work on the finished flooring. Remember, I offer DIY phone coaching if you need help! GO HERE to set up your introductory phone or video call with Tim Carter.